THE EQUIPMENT
REQUIRED FOR INSTALLATION AND PROPER OPERATION OF THE HC-1 APPLIANCE IS AS FOLLOWS:
- 1/2" cold water connection to the machine, with shut-off valve
- 1/2" hot water connection to the machine, with shut-off valve
- Waste water outlet via 32 mm. pipe
- Syphon for drainage connection to waste water pipe
- Constant pressure adjustment device tared to at least 2 bar
- Electric heater, at least 60 L., or central heating system
- Oxygen inlet device
- 5 micron activated charcoal filter
- Innovative design
|